New Space/the area around Technické muzeum: Difference between revisions

From base48
imported>Martian742
m (→‎parameters: emphasized some params)
imported>Martian742
m (→‎status: added coordinates)
 
(2 intermediate revisions by the same user not shown)
Line 6: Line 6:


The only buildings available in that area are the wooden ones closest to the old fighter aircraft.
The only buildings available in that area are the wooden ones closest to the old fighter aircraft.
Coords: '''49°13'41.797"N, 16°34'49.014"E'''


We're supposed to call back near 2012-07-01, because right now, everything is occupied.
We're supposed to call back near 2012-07-01, because right now, everything is occupied.
Line 12: Line 14:


What I should find out about is '''the price'''..
What I should find out about is '''the price'''..
=== pros ===
=== pros ===
* close to some member's workpaces/homes
* close to some member's workpaces/homes


=== parameters ===
=== parameters ===
* 900 CZK / m2 / year + energy
* wooden buildings, "linkusák" in Czech
* wooden buildings, "linkusák" in Czech
* '''rooms ~34m2 big''', office-type, but '''dirty/loud work''' allowed
* '''rooms ~34m2 big''', office-type, but '''dirty/loud work''' allowed

Latest revision as of 09:03, 12 June 2012

Back to Project page

status

  • available from: 2012-07-01

Called the contact person. user:martian742

The only buildings available in that area are the wooden ones closest to the old fighter aircraft.

Coords: 49°13'41.797"N, 16°34'49.014"E

We're supposed to call back near 2012-07-01, because right now, everything is occupied.

Then we can be presented with rooms ~34m2 big, each, not necessarily connected/adjacent, but internal walls' demolition possible. :)

What I should find out about is the price..

pros

  • close to some member's workpaces/homes

parameters

  • 900 CZK / m2 / year + energy
  • wooden buildings, "linkusák" in Czech
  • rooms ~34m2 big, office-type, but dirty/loud work allowed
    • there are people already, doing reverse osmosis & PC water-cooler machining
  • central heating by 2 gas boilers distributed by radiators in the rooms
  • no air-conditioning, unlike in Brmlab's industrial space