New Space/the area around Technické muzeum: Difference between revisions
imported>Martian742 m (→parameters: emphasized some params) |
imported>Martian742 m (→status: added coordinates) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 6: | Line 6: | ||
The only buildings available in that area are the wooden ones closest to the old fighter aircraft. | The only buildings available in that area are the wooden ones closest to the old fighter aircraft. | ||
Coords: '''49°13'41.797"N, 16°34'49.014"E''' | |||
We're supposed to call back near 2012-07-01, because right now, everything is occupied. | We're supposed to call back near 2012-07-01, because right now, everything is occupied. | ||
Line 12: | Line 14: | ||
What I should find out about is '''the price'''.. | What I should find out about is '''the price'''.. | ||
=== pros === | === pros === | ||
* close to some member's workpaces/homes | * close to some member's workpaces/homes | ||
=== parameters === | === parameters === | ||
* 900 CZK / m2 / year + energy | |||
* wooden buildings, "linkusák" in Czech | * wooden buildings, "linkusák" in Czech | ||
* '''rooms ~34m2 big''', office-type, but '''dirty/loud work''' allowed | * '''rooms ~34m2 big''', office-type, but '''dirty/loud work''' allowed |
Latest revision as of 09:03, 12 June 2012
status
- available from: 2012-07-01
Called the contact person. user:martian742
The only buildings available in that area are the wooden ones closest to the old fighter aircraft.
Coords: 49°13'41.797"N, 16°34'49.014"E
We're supposed to call back near 2012-07-01, because right now, everything is occupied.
Then we can be presented with rooms ~34m2 big, each, not necessarily connected/adjacent, but internal walls' demolition possible. :)
What I should find out about is the price..
pros
- close to some member's workpaces/homes
parameters
- 900 CZK / m2 / year + energy
- wooden buildings, "linkusák" in Czech
- rooms ~34m2 big, office-type, but dirty/loud work allowed
- there are people already, doing reverse osmosis & PC water-cooler machining
- central heating by 2 gas boilers distributed by radiators in the rooms
- no air-conditioning, unlike in Brmlab's industrial space